Complete the site investigation
Soil, restrictive layers, groundwater, washes and the reserve disposal area affect the design. Testing determines whether conventional disposal is suitable.
Check the property first
Confirm sewer availability, existing permits, wells and usable space. A large lot does not automatically mean any system will fit.
Submit the design
Provide the Notice of Intent package, site plan, calculations, materials and maintenance plan through the county process. Respond to corrections and pay invoiced fees.
Wait for Construction Authorization
County approval comes before construction or replacement. Build to the approved layout and tank specification.
Inspect, test and authorize use
Complete inspections and required paperwork. Pima requires Discharge Authorization before the system is buried and put into use.
Read our Tucson septic sizing, materials and care guide.